TM 5-3810-306-10Positioning Outrigger Floats2.Set EXTEND/RETRACT toggle switch to EXTENDposition.3.Set left or right EXTENSION toggle switch to extendeither front or rear outrigger. The appropriateoutrigger should begin to extend.NOTEMore than one outrigger can beextended at one time. However, toensure that all four outriggers are fullyextended, each outrigger extensionshould be performed individually.4.After all four outrigger beams are fully extended, useleft or right STABILIZER toggle switch to extend frontor rear stabilizer. (The EXTEND/RETRACT toggleswitch should remain in the EXTEND position.)5.Extend each stabilizer, positioning float asnecessary, until locking levers of float engage thestabilizer cylinder.6.With each stabilizer float firmly touching ground, useSTABILIZER toggle switches to extend frontstabilizers 3 to 4 inches (7.6 to 10.2 cm).7.Then, use STABILIZER toggle switches to extendrear stabilizers 3 to 4 inches (7.6 to 10.2 cm).8.Repeat the procedures in steps 6 and 7 until allwheels are clear of ground and crane is level, asindicated by the sight bubble level indicator locatedat right side control panel. If you suspect that thesight bubble level indicator is out of adjustment,verify and adjust it as follows.a.Locate crane on a firm level surface.b.Extend and set outriggers. Level crane, asindicated by the sight bubble level indicator,using the outriggers.2-46
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business