TM 5-3810-306-20
f.
Install clamps (2), rubber connectors (3) and air
cleaner assemblies onto tube ends.
g. Position air cleaner assemblies in mounting
bands and install screws (19) and nuts (18).
h. Align all air cleaner piping and tighten all clamps
(2) and mounting bands (4).
2.
CONNECT GROUND CABLE AT SFUNT. (REFER
TO PAGE 8-109.)
END OF TASK
5-3