Home
Download PDF
Order CD-ROM
Order in Print
Section IV. ENGINE STARTING AID MAINTENANCE
Section V. FUEL PUMP MAINTENANCE
TM-5-3810-306-20 Container Crane 40-Ton Rough Terrain Model RTB75CC Manual
Page Navigation
122
123
124
125
126
127
128
129
130
131
132
TM 5-3810-306-20
QUICK START ETHER VALVE AND TUBING REPLACEMENT
TOOLS:
General mechanic’s tool kit: automotive (
5180-00-177-7033
)
SUPPLIES:
Lockwashers
(Item 2, Appendix C) (4 Required)
EQUIPMENT CONDITIONS: Disconnect ground cable at shunt. (Refer to page 8-109.)
Quick start starting fluid cylinder removed. (Refer to page 5-16.’
REMOVAL:
1.
DISCONNECT ELECTRICAL WIRE (8), AND
ETHER VALVE (9) AND TUBING (1).
a. Tag and disconnect electrical wire (8) to
temperature sender.
b. Unscrew plug (3), atomizer (2), and tube (1)
from side of engine cylinder head.
c. Disconnect tubing (1) and elbow (10) from ether
valve (9).
d. Remove
two
capscrews
(5),
nuts
(7),
lockwashers
(6) and grounding wire (4). Discard
lockwashers (6).
e. Remove ether valve (9).
2.
INSPECT PARTS FOR DAMAGE. REPLACE AS
REQUIRED.
INSTALLATION:
1.
INSTALL ETHER VALVE (9) head.
a. Install elbow (10) and tubing (1) to ether valve
(9)
b. Hold ether valve (9) against hood. Install two
capscrews (5), grounding wire (4), nuts (7) and
new lockwashers (6) Remove tag
c. Connect electrical wire (8) to temperature
sender. Remove tags
2.
INSTALL TUBING (1) TO SIDE OF ENGINE
CYLINDER HEAD.
a. Install plug (3) and atomizer (2) on side of
engine cylinder head.
b. Connect tubing (1) to atomizer.
3.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
4..
INSTALL QUICK START STARTING FLUID.
(REFER TO PAGE 5-16.)
END OF TASK
5-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business