TM 5-3810-306-20
AIR GOVERNOR REPLACEMENT
TOOLS: General mechanics tool kit: automotive (5180-00-177-7033)
SUPPLIES
Lockwashers (Item 5, Appendix C)
EQUIPMENT CONDITIONS: Crane wheels are chocked.
Disconnect ground cable at shunt. (Refer to page 8-109.)
Air system is purged. (Refer to page 11-2.)
REMOVAL:
1.
REMOVE AIR GOVERNOR (1).
a.
Tag and disconnect three air lines on air
governor (1). Plug air lines.
b.
Remove two nuts (3) and lockwashers (2) to free
air governor (1) from carrier frame. Discard
lockwashers.
c.
Remove three fittings. Retain for installation or
replace if damaged.
INSTALLATION:
1.
INSTALL AIR GOVERNOR (1).
a.
Install three fittings.
b.
Align air governor (1) with studs on carrier frame
and secure with two nuts (3) and new
lockwashers (2).
c.
Remove tags, plugs and connect air lines to air
governor (1).
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
3.
START-UP ENGINE AND ALLOW AIR PRESSURE
TO BUILD UP. (REFER TO TM 5-3810-306-10.)
4.
CHECK
ALL
AIR
OPERATED
FUNCTIONS.
(REFER TO TM 5-3810-306-10.).
END OF TASK
11-20