TM 5-3810-306-20
b. Insert wire rope (8) end through wedge socket
(3) and loop around anchor wedge (2) as shown.
Allow dead end of cable to extend nine inches
(22.86 cm) from wedge socket. Position a six
inch (15.3 cm) piece of cable (1) flush with dead
end and secure with cable clamp (4).
NOTE
Both ends of six inch (15.3 cm) cable
must be bound with wire seizing.
c. Insert anchor wedge (2) in wedge socket (3).
Pull firmly on free end of wire rope (8) to secure
anchor wedge (2).
NOTE
If wedge does not seat securely
carefully tap top of wedge with a
mallet.
d. Position wedge socket on boom nose and
secure with pin (7) and cotter pin (6).
2.
LUBRICATE WIRE ROPE (8). (REFER TO LO 5-
3810-306-12.)
3.
REPOSITION AUXILIARY BOOM NOSE AND
CONNECT ANTI-TWO BLOCK CONNECTION.
4.
RAISE AND LOWER HOOK BLOCK TO CHECK
FOR PROPER OPERATION. (REFER TO TM 5-
3810-306-10.)
END OF TASK
17-8