TM 5-3810-307-10
d.
Set the LMI panel for the proper operating mode. If necessary, refer to
e.
f.
Raise, lower, and swing the boom right and left a minimum of 45 degrees.
g.
h.
Raise and lower the hoist rope a few times at various boom lengths. Check
5-7.3
Using Load Chart.
NOTE
In addition to the load chart, the crane is equipped
with a Load Moment Indicating (LMI) system to aid
the operator in craning operations, refer to Appendix
NOTE
One of the most important tools of every crane is the
load chart found in the operator's cab. Refer to
The load chart contains a large amount of information, which must be thoroughly
understood by the operator.
5-78