• Google+Share on Google+
    • FacebookShare on Facebook
    • LinkedInShare on LinkedIn
    • TwitterShare on Twitter
    • DiggShare on Digg
    • StumbleUponShare on StumbleUpon
    • Home
    • Download PDF
    • Order CD-ROM
    • Order in Print
    Housings, Covers. Etc. - Continued
    Housings, Covers. Etc. - Continued

    Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 1 - Pt2 Page Navigation
      56    57    58    59    60  61  62    63    64    65    66  
    img
    SM02-025-0
    Page 47
    N OTE
    The idler gear and taper bearing cup as-
    sembly and the forward high clutch as-
    sembly must be installed in the converter
    housing at the same time as the idler gear
    must be positioned between the forward
    clutch front bearing and the clutch drum.
    Install the idler outer taper bearing with
    small diameter of taper down. Make sure
    locating ring is in full position in ring
    groove.
    29.  Spread the ears on the forward high clutch
    front bearing locating ring.
    Spread the ears on the reverse clutch front
    32.
    bearing locating ring. Tap the reverse and 3rd and 4th
    clutch assembly into the converter housing. Align the
    snap ring groove in the bearing with the snap ring in
    the housing, being certain the bearing snap ring is in
    full position in the snap ring groove.
    30.
    Position the outer spacer on the shaft.
    33.
    Install the forward clutch shaft rear bearing into
    the bearing bore with the bearing snap ring toward
    the front of the housing.
    31.  Install the retainer nut on the shaft and torque
    200 to 250 pounds-foot (27.1 to 33.8 kgm). Stake the
    nut securely into the shaft notch.


    Privacy Statement
    Press Release
    Contact

    © Copyright Integrated Publishing, Inc.. All Rights Reserved.