SM02-027-0
Page 17
14.
Check rotation of the freewheeling reaction
17.
Position the impeller cover, lock-up, and tur-
member to ensure of proper freewheel assembly.
bine assembly onto the turbine shaft.
15.
Install the reaction member retainer ring.
18.
Install the turbine hub to turbine shaft retainer
ring.
16.
Install the turbine hub locating ring.
19.
Install the impeller cover to impeller cap-
screws and washers. Tighten to the specified torque.