TM 5-3810-307-24-1-2
TABLE OF CONTENTS - continued
Drawing 13 - Boom Base Junction Box w/ohmmeter on 5 & 6................................. G-47
Drawing 14 - Connection Board in Central Unit w/ohmmeter on X1:34 &
and Blue Wire Disconnected fromX1:35........................................ G-48
Drawing 15- Connection Board in Central Unit w/temporary
4.7 K Ohm Resistor Installed on X1:34 & X1:35............................ G-49
Drawing 16 - Connection Board in Central Unit w/voltmeter on X1:8 & X1:11 ......... G-50
Drawing 17 - Cable Reel Terminal Board w/voltmeter on Terminals 1 & 2 and
on Terminals 1 & 3 ....................................................................... G-51
Drawing 18 - Connection Board in Central Unit w/voltmeter on X1:8 & X1:10 ......... G-52
Drawing 19 - Pressure Transducer Cable w/voltmeter on Terminals A & B and
B & C............................................................................................. G-53
Drawing 20 - Connection Board in Central Unit w/voltmeter on X1:13 & X1:14
w/voltmeter on X1:19 & X1:20...... G-54
Drawing 21 - Connection Board in Central Unit w/voltmeter on X1:30 & X1:33 ....... G-55
Drawing 22 - Secondary Anti-Two Block Switch For Use with Pile-Driver OperationG-56
Section 11 - Procedures ................................................................................................ G-57
Procedure 1 - Strain Relief Installation ...................................................................... G-57
Procedure 2A - EPROM Location and Installation Main Board (0094) ................... G-68
Procedure 2B - EPROM Location and Installation Main Board (0222) ................... G-59
Procedure 3A - Main Board (024-350-300-094) Replacement .................................. G-60
Procedure 3B - Main Board (024-350-300-222) Replacement .................................. G-61
Procedure 4A - Pressure Transducer Zero Adjustment ............................................ G-62
Procedure 4B - Pressure Transducer Zero Adjustment ............................................ G-64
Procedure 5 - Length Potentiometer and Angle Sensor Adjustment ......................... G-66
Section 12 - Theory of LMI Operation............................................................................ G-67
Theory 1A Main Board (024-350-300-094) Measuring Points and Layout ................ G-67
Theory 1B Main Board (024-350-300-222) Measuring Points and Layout ................ G-68
Theory 2 - Theory of Operation of Length Potentiometer .......................................... G-69
Theory 3 - Theory of Operation of Angle Sensor....................................................... G-71
Theory 4 - Theory of Operation of Piston Side Pressure Transducer........................ G-73
Theory 5 - Theory of Operation of Rod Side Pressure Transducer ........................... G-75
G-4 Change-1