• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Timing Pin Housing - Removal (0-57)
Piston and Rod Assemblies Removal - Continued

Maintenance Manual For All-Terrain Crane (ATEC) Diesel Driven, 22 Ton - Vol 2 - Pt2 Page Navigation
  44    45    46    47    48  49  50    51    52    53    54  
img
.
TM 5-3810-307-24-2-2
Plastic Hammer
The gear housing is positioned onto the cylinder
block with two dowel pins. Tap in the area of the
dowel pins with a plastic hammer if difficulty is
encountered removing the housing.
Piston and Rod Assemblies
Removal (0-64)
Mark each rod cap according to cylinder.
Rotate the engine on the rebuild stand so the
cylinder bores are in a horizontal position.
Rotate the crankshaft so the pistons are below the
carbon deposits above the ring travel area.
Use a scraper or a blunt edged instrument to
loosen the carbon deposits. Do not damage the
cylinder with the scraper.
0-30 C-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.