j.
k.
Lock nuts in position with lockplates. After
l.
each piston and rod assembly is installed, bar engine
over to see if piston is binding in liner.
Section XXII. CRANE ENGINE CRANKSHAFT AND BEARINGS
4-74. Removal and Disassembly
a. Remove connecting rod and piston
d. Remove the flywheel and flywheel housing
and disassemble crankshaft and main bearings.
Figure 4-26. Crane engine crankshaft and main
bearings, removal and installation.
Figure 4-27. Crane engine crankshaft and main bearings, exploded view.
4-34