TM5-3810-305-10Installing Upperstructure on Carrier1.2.3.Align the upperstructure and swing bearing bymanually starting four mounting capscrewsand eight washers into the outside comerholes 6, 8, 9 and 11 (Figure 5-38). Lowerupperstructure to swing bearing.Align torque arm on rotary manifold andanchor ear on inside of upperstructure frameby swinging the upperstructure.With alignment correct, install four mountingcapscrews and eight washers in remainingoutside mounting holes. Tighten eightmounting capscrews. The final torquing willbe done after remaining mounting capscrewsare installed on inside of upperstructure.Removing and Stowing Parts Used forAssembly1. Remove hoist cable from lift arm (16) as fol-lows:a.b.c.Remove tether rope from boom head andstow in tool box.Lower hook block to ground and pay outcable 12 in. (305 mm) while maintainingtension on cable. Insert wedge block inwinch drum (Figure 5-6).Remove sheave (14) and cable from liftarm (16) by removing pin (13) from theclevis that retains sheave (14, Figure 5-39). Temporarily lay pin (13) and sheave(14) aside.Figure 5-39 Lifting the Upperstructure5-35Figure 5-6. WedgeBlockinWinchDrum
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business