TM5-3810-305-106.7.8.9.Remove tether rope from tool box and knotrope to boom head quick reeving pin (Figure5-24).Hold on anti-two block BY-PASS switch anduse winch to slowly hoist upperstructure untilsupport bracket clears ground.Remove three pins (23, Figure 5-37) fromboom support that connects it to upperstruc-ture and remove boom support. Set aside forlater disassembly and storage.Remove protective bag from base plate of up-perstructure and place in tool box.Lifting Upperstructure onto CarrierStay clear of hoisted upperstruc-ture while it is being positionedover carrier. Failure to followthis procedure could causeDEATH or serious injury.1. With one person handling the tether rope,raise upperstructure high enough to checkbottom of mounting base plate to see if it isclean. Remove any foreign material that mayhave accumulated on mounting base plate.Figure 5-24 Attached Tether RopeFigure 5-37 BoomSupportRemoval5 - 33
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business