TM5-3810-305-10
6.
7.
8.
9.
Remove tether rope from tool box and knot
rope to boom head quick reeving pin (Figure
5-24).
Hold on anti-two block BY-PASS switch and
use winch to slowly hoist upperstructure until
support bracket clears ground.
Remove three pins (23, Figure 5-37) from
boom support that connects it to upperstruc-
ture and remove boom support. Set aside for
later disassembly and storage.
Remove protective bag from base plate of up-
perstructure and place in tool box.
Lifting Upperstructure onto Carrier
Stay clear of hoisted upperstruc-
ture while it is being positioned
over carrier. Failure to follow
this procedure could cause
DEATH or serious injury.
1. With one person handling the tether rope,
raise upperstructure high enough to check
bottom of mounting base plate to see if it is
clean. Remove any foreign material that may
have accumulated on mounting base plate.
Figure 5-24 Attached Tether Rope
Figure 5-37 Boom Support Removal
5 - 3