TM5-3810-305-10NOTETwo personnel are required onthe deck next to the upperstruc-ture, one on each side, to observethe upperstructure alignment.Another person is required on theground to handle the tether rope.2. Continue to hoist assembly high enough toclear rotary manifold and electrical collectorring cover (1 to 2 in. [25.4 to 50.8 mm] issufficient).3. By pushing on lift arm and pulling with tetherrope, manually swing upperstructure intomounting position with boom pointing in a 10o’clock direction on left side of carrier (Figure5-38).Keep hands and arms clear of allpinch points while checking thealignment of the upperstructureand the carrier mounting surface.Failure to follow this procedurecould cause SERIOUS INJURY.CAUTION Make sure the base plate openingclears the connections on therotary manifold, Failure tofollow this procedure could causedamage to equipment.4. Slowly lower the upperstructure over rotarymanifold to within 0.5 in. (13 mm) of rotarymanifold.Figure 5-38 Installing Upperstructure5 - 34
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business