Figure 11. Cylinder Head Installation.
FRONT GEAR COVER AND GASKET MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  202    203    204    205    206  207  208    209    210    211    212  
img
. . .
TM 5-3810-305-23
0031
FOLLOW-ON MAINTENANCE
1.
Install valve covers (WP 0035).
2.
Install high-pressure fuel injection lines (WP 0048).
3.
Connect battery cables (WP 0076).
4.
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
0031-8
03/15/2011Rel(1.8)root(maintwp)wpno(M00036)