TM 5-3810-305-23
0035
CLEANING
Clean parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSPECTION
Inspect parts IAW General Maintenance Instructions (WP 0162).
END OF TASK
INSTALLATION
Install four new gaskets (Figure 2, Item 4), valve covers (Figure 2, Item 1), new o-rings (Figure 2, Item 3),
and capscrews (Figure 2, Item 2). Tighten four capscrews to 18 ft-lb (24 Nm).
3
2
4
1
M0014105
Figure 2. Valve Covers Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00040)