TM 5-3810-305-23
0045
INSTALLATION
1.
Install new gasket (Figure 2, Item 5), lift pump (Figure 2, Item 4), and two capscrews (Figure 2, Item 3) to
engine (Figure 2, Item 6). Tighten two capscrews to 18 ft-lb (24 Nm).
2.
Connect fittings (Figure 2, Items 1 and 2) to lift pump (Figure 2, Item 4).
1
2
6
5
4
3
M0291105
Figure 2. Lift Pump Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00051)