TM 5-3810-305-23
0076
INSTALLATION - Continued
4.
Install flexible trim (Figure 9, Item 2) and grommet (Figure 9, Item 1) on battery box.
5.
Route cables (Figure 9, Items 3 and 4) through flexible trim (Figure 9, Item 2) and grommet (Figure 9, Item 1).
2
1
3
4
M0099105
Figure 9. Battery and Cables Assembly Installation.
03/15/2011Rel(1.8)root(maintwp)wpno(M00082)