19.
Install jumper cable (Figure 14, Item 3) to batteries (Figure 14, Items 4 and 5).
20.
Connect cable (Figure 14, Item 1) and two white wires to cable (Figure 14, Item 2).
21.
Install cable (Figure 14, Item 2) to battery (Figure 14, Item 5).
1
2
5
4
3
M0090105
Figure 14.
Battery and Cables Assembly Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE