TM 5-3810-305-23
0083
INSTALLATION
NOTE
Install all wires and wiring harnesses as tagged during removal.
1.
Install fuel toggle switch (Figure 2, Item 10), washer (Figure 2, Item 12), and nut (Figure 2, Item 11) on inside
rear cab wall.
2.
Install resistor module (Figure 2, Item 9), four screws (Figure 2, Item 2), resistor cap (Figure 2, Item 1), and
nuts (Figure 2, Item 8) to inside rear cab wall.
3.
Install MSD-ICE diagnostic connector (Figure 2, Item 7), four screws (Figure 2, Item 4), ground wires
(Figure 2, Item 5), nuts (Figure 2, Item 6), plug and MSD-ICE cap (Figure 2, Item 3) to inside rear cab wall.
1
8
7
9
2
3
6
4
5
10
11,12
M0155105
Figure 2. MSD-ICE DCA Connector Resistor/Module Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00089)