TM 5-3810-305-23
0129
INSTALLATION - Continued
Valve Control Cables - Continued
9.
Install front panel (Figure 10, Item 3) with six new lockwashers (Figure 10, Item 1) and capscrews
(Figure 10, Item 2).
1
2
3
M0558105
Figure 10. Valve Control Cables Installation.
END OF TASK
ADJUSTMENT
1.
Adjustment on hoist, winch, and telescope cables are made by installing disconnect assemblies
(Figure 11, Item 3) until they bottom on cable ends. Turn out two turns and tighten jam nuts
(Figure 11, Item 2).
2.
Adjustment for hoist winch and telescope levers are made with electrical power disconnected. Push levers to
full forward position (full rearward for winch). Adjust yoke (Figure 11, Item 1) so that no movement to valve
bank piston is made. Reposition locking nuts on cable if further adjustment is necessary.
3.
Return levers to neutral position. Adjust yoke (Figure 11, Item 1) on remaining levers in alignment with hoist
and telescope levers.
4.
Tighten jam nuts on all five cables for operator's safety.
03/15/2011Rel(1.8)root(maintwp)wpno(M00145)