INSTALLATION - Continued
Valve Control Cables
NOTE
The following is a procedure for installation of the operator's end of one valve control cable.
The procedure for installation of the operator's end of the remaining valve control cables
is identical.
1.
Pull cable (Figure 8, Item 8) through access hole in rear cab panel.
2.
Install two locking nuts (Figure 8, Item 5) and washers (Figure 8, Item 6) on cable (Figure 8, Item 8).
3.
Install jam nut (Figure 8, Item 4) and yoke (Figure 8, Item 3) on cable (Figure 8, Item 8).
4.
Install yoke (Figure 8, Item 3), pin (Figure 8, Item 2), and new cotter pin (Figure 8, Item 7) on lever assembly
(Figure 5, Item 1).
3
4
2
5
1
7
6
8
M0563105
Figure 8. Valve Control Cables Installation.