• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Boom Hoist, Extend, and Winch Cable Installation.
Figure 8. Valve Control Cables Installation.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  854    855    856    857    858  859  860    861    862    863    864  
img
.
TM 5-3810-305-23
0129
INSTALLATION - Continued
Swing And Outrigger Cable
NOTE
The valve end of boom hoist, extend and winch cables are different from outrigger and swing
cable. The end of each cable group must be installed using the correct procedure.
1.
Carefully position cable (Figure 7, Item 4) in place on vehicle.
2.
Install two clamps (Figure 7, Item 7), washers (Figure 7, Items 6 and 8), and locking nuts (Figure 7, Item 5)
on cable.
3.
Tighten two locking nuts (Figure 7, Item 3) to hold cable in place on bracket.
4.
Install two jam nuts (Figure 7, Item 1) and clevis (Figure 7, Item 9) on end of cable. Thread two jam nuts and
clevis to full threaded engagement. Tighten rear jam nut to lock clevis in place.
5.
Position cable (Figure 7, Item 4) in place and install pin (Figure 7, Item 10) and cotter pin (Figure 7, Item 2).
1
2
1
10
9
3
4
5
6
7
8
M0561105
Figure 7. Swing and Outrigger Cable Installation.
0129-9
03/15/2011Rel(1.8)root(maintwp)wpno(M00145)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.