TM 5-3810-305-23
0139
INSTALLATION - Continued
4.
Position two yokes (Figure 6, Item 3) on end of handles (Figure 6, Item 1).
5.
Install two pins (Figure 6, Item 2) and new cotter pins (Figure 6, Item 4).
1
2
4
3
M0537105
Figure 6. Swing/Telescope Valve Controls Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00155)