TM 5-3810-305-23
0144
INSTALLATION - Continued
1
2
3
4
5
6
7
13
5
12
13
14 11
10 9
17 16 15
8
18
7
M0414105
Figure 2.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
Check hydraulic oil level. Fill to proper level, if necessary (TM 5-3810-305-10).
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00161)