TM 5-3810-305-23
0153
FOLLOW-ON MAINTENANCE
1.
2.
3.
Install deck plates (TM 5-3810-305-10).
4.
5.
Fill reservoir to proper level (TM 5-3810-305-10).
6.
7.
Place boom in resting position (TM 5-3810-305-10).
8.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
0153-8
03/15/2011Rel(1.8)root(maintwp)wpno(M00169)