• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Hydraulic Reservoir Installation.
BOOM ANGLE INDICATOR MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  1046    1047    1048    1049    1050  1051  1052    1053    1054    1055    1056  
img
. . . .
TM 5-3810-305-23
0153
FOLLOW-ON MAINTENANCE
1.
Install hydraulic system valve bank (WP 0146).
2.
Install return filter assembly (WP 0148).
3.
Install deck plates (TM 5-3810-305-10).
4.
Connect battery cables (WP 0076).
5.
Fill reservoir to proper level (TM 5-3810-305-10).
6.
Bleed air from suction filter housing (WP 0144).
7.
Place boom in resting position (TM 5-3810-305-10).
8.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
0153-8
03/15/2011Rel(1.8)root(maintwp)wpno(M00169)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.