• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Swing Bearing Assembly Installation.
Figure 7. Upperstructure Installation.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  1093    1094    1095    1096    1097  1098  1099    1100    1101    1102    1103  
img
.
TM 5-3810-305-23
0158
INSTALLATION - Continued
Upperstructure - Continued
CAUTION
Block boom hoist cylinder with suitable bracing material to prevent boom hoist cylinder from
contacting rotary manifold. Failure to follow this caution may result in damage to equipment.
1.
Use a lifting device to lift upperstructure (Figure 6, Item 4) to a height sufficient to clear rotary manifold
(Figure 6, Item 3) and electrical collector ring (Figure 6, Item 2). Lower onto frame. Use suitable bracing material
under boom hoist cylinder (Figure 6, Item 1) to protect electrical collector ring and rotary manifold.
2.
Install eight capscrews (Figure 6, Item 6) and 16 washers (Figure 6, Item 5) on outside of upperstructure
(Figure 6, Item 4).
1
2
3
4
6
5
M0613105
Figure 6.
Upperstructure Installation.
WARNING
Weight of boom hoist cylinder is approximately 507 lb (230 kg). Use adequate lifting
equipment to lift and support boom hoist cylinder. DO NOT lift over personnel or let personnel
walk underneath suspended load. Failure to follow this warning may cause injury or death to
personnel.
3.
Use lifting device to raise boom hoist cylinder and hold it in a vertical position.
0158-9
03/15/2011Rel(1.8)root(maintwp)wpno(M00175)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.