TM 5-3810-305-23
0158
INSTALLATION - Continued
Upperstructure - Continued
1
2
M0611105
Figure 9.
Upperstructure Installation.
9.
Lower boom hoist cylinder onto suitable lifting device.
10.
Tighten dipstick cap.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00175)