TM 5-3810-305-23
0158
INSTALLATION - Continued
Upperstructure - Continued
1
2
3
9
8
4
5
7
6
M0612105
Figure 8.
Upperstructure Installation.
8.
Connect two boom extend cylinder hoses and boom hoist cylinder hoses (Figure 9, Item 1) to rotary manifold
(Figure 9, Item 2) elbows.
03/15/2011Rel(1.8)root(maintwp)wpno(M00175)