TM 5-3810-306-20
3.
INSPECT PARTS FOR DAMAGE. REPLACE AS
REQUIRED.
INSTALLATION:
1.
INSTALL FITTING (2), THROTTLE CYLINDER (7),
AND CONNECT AIR LINE (1).
a.
Screw fitting (2) into throttle cylinder (7).
b.
Hold throttle cylinder (7) in place on bracket and
secure with two capscrews (8), flatwashers (9),
lockwashers (10), and nuts (11).
c.
Connect air line (1).
d.
Make sure ball joint (6) on new throttle cylinder
(7) is installed in same position as other
(removed) throttle cylinder (7). If not, do steps e
and f.
e.
Remove nut (12). Pull screw (13) from throttle
lever (14). Remove ball joint (6)
f.
Put ball joint (6) in same place as other ball joint
(6). Install screw (13) and nut (12).
2.
INSTALL CONTROL ROD (3) AND ADJUST NUT
(4).
a.
Screw control rod (3) in throttle cylinder ball joint
(6).
b.
Press and hold throttle lever (14) against throttle
cylinder (7).
c.
Screw fuel injector ball joint (5) onto other end of
control rod and secure to fuel injection pump
lever using flatwasher (15), lockwasher (16) and
capscrew (17).
d.
Tighten nut (4) against fuel injector ball joint (5).
3.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
4.
START-UP ENGINE AND ALLOW AIR SYSTEM
TO BUILD UP TO PROPER PRESSURE. (REFER
TO TM 5-3810-306-10.)
5.
PRESS
ACCELERATOR
PEDAL
SLOWLY.
ENGINE
RPM
SHOULD
INCREASE
AS
ACCELERATOR PEDAL PRESSED TO FLOOR.
IF NOT, ADJUST NUT (4) ON CONTROL ROD (3)
AS REQUIRED.
END OF TASK
11-36