Home
Download PDF
Order CD-ROM
Order in Print
MAIN AND AUXILIARY WIRE ROPE INSTALLATION - cont
POSITIVE SWING LOCK CONTROL CABLE INSTALLATION
TM-5-3810-306-20 Container Crane 40-Ton Rough Terrain Model RTB75CC Manual
Page Navigation
404
405
406
407
408
409
410
411
412
413
414
TM 5-3810-306-20
Section III. TURNTABLE MAINTENANCE
POSITIVE SWING LOCK CONTROL CABLE INSTALLATION
TOOLS: General mechanic’s tool kit: automotive (
5180-00-177-7033
)
SUPPLIES:
Cotter pin (Item 32, Appendix C)
Lockwashers (Item 5, Appendix C) (2 Required)
Lockwashers (Item 15, Appendix C) (2 Required)
EQUIPMENT CONDITIONS: Boom raised enough to allow access to swing lock.
Disconnect ground cable at shunt. (Refer to page 8-109.)
DISASSEMBLY:
1.
DISASSEMBLE
POSITIVE
SWING
LOCK
CONTROL LEVER.
a.
Remove cotter pin (19), washer (20), and clevis
pin (21) to free control cable clevis (11). Discard
cotter pin (19).
b.
Remove end nut (12) securing clevis (11) to
control cable.
c.
Remove two capscrews (13),
lockwashers
(15)
and nuts (16) to free cable clamp (14) from
mounting bracket. Discard lockwashers.
d.
Remove brake lever (1) by removing two
capscrews (7), spacers (9), clamp (18), washers
(8),
lockwashers
(5), washers (4) and nuts (6)
from
cab
mounting
bracket.
Discard
lockwashers.
e.
Remove clevis pin (2), washer (17) and cotter
pin (3) to free control cable from control lever
(1). Discard cotter pin (3).
f.
Pull control cable through cab wall. Discard
grommet (10) if damaged.
2.
INSPECT PARTS FOR DAMAGE. REPAIR IF
NECESSARY.
17-15
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business