TM 5-3810-306-20e.Slowly rotate hoist drum in raise direction,ensuring first layer of wire rope is evenly woundonto drum and all wraps are tight.NOTEUse of a rubber mallet may be neededto tap on wraps to ensure they aretight together.f.Continue to wind remainder of wire rope on hoistdrum slowly, maintaining an even tension onwire rope.2.CABLE REEVING FOR HOOK BLOCK (MAINWIRE ROPE):NOTETo reeve the hook block, theauxiliary boom nose anti-two blockconnection must be unplugged andthe auxiliary boom nose unpinned onthe right side (facing forward) andswung to the left.a.Allow a sufficient length of cable to be removedfrom main hoist.b.Position cable over upper boom nose sheaveand then route through remaining sheaves asshown.c.Install hook block. (Refer to page 17-7.) d.Swing auxiliary boom nose in place and securewith pin and clip.d.Connect anti-two block jumper cable.3.CABLE REEVING FOR OVERHAUL BALL(AUXILIARY WIRE ROPE):NOTELifting capacity of auxiliary hoist witha single part line over auxiliary boomnose is limited to 4.5 tons (4082 kg).a.Allow a sufficient length of cable to be removedfrom auxiliary hoist.b.Position cable over upper boom nose sheaveand then route over auxiliary boom nose sheaveas shown.c.Install overhaul ball. (Refer to page 17-4.)17-14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business