(2) Inspect all parts for wear, breaks, and other
damage. Replace worn and damaged parts
as necessary.
c. Installation.
Install the turn signal switch as
123. Clearance Marker Lights
a. Removal and Disassembly.
Remove and
disassemble the clearance lights as shown in figure 69.
b. Cleaning and Inspection. Clean the clearance
1
Screw
6
Gasket
2
Door
7
Nut
lights with an approved cleaning solvent.
3
Lens
8
Washer
c. Reassembly and Installation. Reassemble and
4
Lamp
9
Screw
install the clearance lights in reverse order as shown on
5
Housing
10
Nut
Figure 69. Clearance light, removal, disassembly,
and installation.
b. Cleaning and Inspection.
(1) Clean all parts with a cloth dampened with
an approved cleaning solvent and dry
thoroughly.
Section VIII. CRANE ENGINE ELECTRICAL SYSTEM,
CONTROLS AND INSTRUMENTS
124. General
b. Cleaning and Inspection. Clean and inspect the
The crane shovel 24-volt electrical system consists of
distributor coil, points, condenser, resistor, and rotor cap
two 12-volt batteries connected in series,. a starter,
generator, generator regulator, ignition coil, distributor,
spark plugs, lights, gages, and the necessary wiring to
d. Engine Timing. Time the engine in a similiar
operate all components of the electrical system. For
proper removal and installation of all wiring on the
127. Spark Plugs and Cables
a. Removal and Installation. Remove and install the
125. Distributor
spark plugs and cables in a similar manner as described in
a. Removal and Installation. Remove and install
the distributor in a similar manner as described in
b. Cleaning and Inspection. Clean and inspect spark
b. Cleaning and Inspection. Clean and inspect the
126. Distributor Coil, Points, Condenser, Resistor,
128. Starter Solenoid
and Rotor Cap
a. Test. Test the starter solenoid in a
similar manner
a. Removal and Installation. Remove and install
the distributor coil, points, condenser, resistor, and rotor
b. Removal and Installation. Remove and install the
starter solenoid in a similar manner as described in
AGO 6819A
108