Figure 76. Horn assembly, removal and installation.
1
Floodlight and wiring
a10
Wire
2
Floodlight assembly
11
Terminal
3
Screw
12
Sleeve
4
Molding
13
Shell
5
Molding
14
Band
6
Mounting ring
15
Lockwasher
7
Sealed unit
16
Spring
8
Screw
17
Terminal plate
9
Terminal
18
Connector and wiring
19
Body
Figure 78. Floodlight assembly.
142. Clearance Light
a. Removal and Installation. Remove and install
clearance lights in a similar manner as described in
b. Cleaning and Inspection. Clean and inspect the
Figure 77. Floodlight, removal and installation.
d. Reassembly. Reassemble the floodlight in the
143. Cab Wiring Harness
reverse of the numerical sequence as illustrated in
Inspect and repair the cab wiring harness in a similar
manner as for the carrier cab and chassis wiring harness
Section IX. CARRIER ENGINE COOLING SYSTEM
radiator for cooling. Until the engine reaches operating
144. General
temperature, all or part of the water leaving the engine
The carrier engine has a pressure cooling system.
jackets is bypassed by means of thermostats, directly to the
Water from the radiator is forced by the water pump
water pump for recirculation.
through the engine water 112 jackets and back into the
AGO 6819A
112