flush with the face of
the ground sleeve.
Notice that the dowel
pin hole in the key
is off center. Press
the ground sleeve
and
the
key
into
the
housing
(see
9. If
oil
pump
drive
gear
(2,
verter pump hub oil seal (1) were re-
moved, install the gear. Install the oil
seal with the spring side toward the
gear, using replacer J 7475.
10. Position the converter on the table
with the rear end up.
gear assembly by positioning the gear in
Figure 4C-20. Removing (or
Installing) Plug from Converter
Housing
4C-33) in its bore. Use a soft drift or a
bolt of the proper size threaded into the
shaft and tap the shaft into place.
(17).
3. Press double row ball bearing assem-
bly (8) from converter pump hub (17).
4. Clean and inspect parts as explained
under "Cleaning and Inspection" on page
4C-10.
5. Install double row ball bearing assem-
bly (08), seal ring, groove side up, into
bearing
pump
hub
(17).
Press
the
bearing until it is firmly seated in the
hub.
Installing) Output Shaft
12. Install the lock washer, seal ring and
square head plug into the oil pump idler
Torque the plug to 80-100 ft-lbs.
CONVERTER PUMP AND HUB ASSEM-
BLY. To rebuild the converter pump
and
hub,
proceed
as
follows
(see
1. The converter pump was removed
when the converter was disassembled in-
to subassemblies. No further disassem-
bly is necessary.
Idler Gear Shaft