1. Lower carrier to ground, using the following
procedure:
a.
b.
Start engine. Raise outrigger beams. Lift
outrigger pads that are underneath boom
just enough to clear ground.
CAUTION
Do not allow outrigger beam,
located under upperstructure, to
contact winch hoses. Failure to
follow this procedure could cause
damage to equipment.
Using swing lever, rotate swing bearing to
unlocked position with cam roller on axle
lockout valve, located at rear, bottom of
rotary manifold, centered in notch.
Figure 5-20 Location of Boom Hoist Cylinder Hoses
After Disconnection
2.
3.
NOTE
This position will permit oscilla-
tion of rear axle when maneuver-
ing carrier away from upperstruc-
ture.
Use crab steering and short forward-reverse
movements to move the carrier until it is clear
of upperstructure.
Prepare outriggers for travel, using the fol-
lowing procedure:
a.
b.
c.
Raise outrigger beams to travel position.
Shut engine off.
Remove nuts, washers, bolts and pads
from ends of outrigger beams. Reinstall
bolts, washers and nuts after pads are
removed.