TM 5-3810-305-23
0049
INSTALLATION - Continued
High-Pressure Tubes - Continued
2.
Connect No. 3 cylinder high-pressure tube (Figure 15, Item 5) and No. 4 cylinder high-pressure tube
(Figure 15, Item 4) to injection pump (Figure 15, Item 7).
3.
Connect No. 1 cylinder high-pressure tube (Figure 15, Item 6) and No. 2 cylinder high-pressure tube
(Figure 15, Item 3) to injection pump (Figure 15, Item 7).
4.
Install four capscrews (Figure 15, Item 1) and tube clamps (Figure 15, Item 2) to high-pressure tubes.
4
2
3
1
5
7
6
M0252105
Figure 15. High-Pressure Tubes Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
03/15/2011Rel(1.8)root(maintwp)wpno(M00055)