• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Deck Plates Maintenance.
OUTRIGGER ASSEMBLY MAINTENANCE - Continued

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  780    781    782    783    784  785  786    787    788    789    790  
img
. . . . . . . . . . . . . .
TM 5-3810-305-23
0123
FIELD MAINTENANCE
OUTRIGGER ASSEMBLY MAINTENANCE
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Washer, Lock M16 (WP 0172, Table 1, Item 130)
Tool Kit, General Mechanic's (WP 0171, Table 1,
Item 17)
Qty: 8
Caliper, Micrometer, Outside (WP 0171, Table 1,
Washer, Lock M25 (WP 0172, Table 1, Item 7)
Item 21)
Qty: 4
Caliper Set, Micrometer, Inside (WP 0171, Table
1, Item 22)
Personnel Required
Fixture, Arbor Press (WP 0171, Table 1, Item 1)
(Two)
Gloves, Rubber (WP 0171, Table 1, Item 26)
Goggles, Industrial (WP 0171, Table 1, Item 27)
Suitable Lifting Device, 500-lb (227 kgs) Minimum
References
Capacity
WP 0162
Materials/Parts
Equipment Condition
Bearing Sleeve (WP 0172, Table 1, Item 109)
Vehicle parked on level ground (TM
Qty: 16
5-3810-305-10)
Nitrogen, Liquid, Industrial Grade (WP 0170, Table
Boom in horizontal position and fully retracted (TM
1, Item 49) Qty: 1
5-3810-305-10)
Rag, Wiping (WP 0170, Table 1, Item 52) Qty: 1
Sealing Compound, Loctite 271 (WP 0170, Table
1, Item 57) Qty: 1
0123-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00138)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.