TM 5-3810-305-23
0138
INSTALLATION - Continued
4.
Position three yokes (Figure 6, Item 1) on end of handles (Figure 6, Item 2).
5.
Install three pins (Figure 6, Item 4) and new cotter pins (Figure 6, Item 3).
2
1
4
3
M0484105
Figure 6. Boom Hoist, Winch, and Outrigger Valve Controls Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
2.
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Outriggers retracted and raised (TM 5-3810-305-10).
5.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE