TM 5-3810-305-23
FIELD MAINTENANCE
SWING/TELESCOPE VALVE CONTROLS MAINTENANCE
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Washer, Lock M10 (WP 0172, Table 1, Item 129)
Tool Kit, General Mechanic's (WP 0171, Table 1,
Item 17)
Qty: 2
Qty: 2
Materials/Parts
155) Qty:
2
References
Pin, Cotter 3X30 (WP 0172, Table 1, Item 156)
Qty: 3
Equipment Condition
1
Boom in horizontal position and fully retracted (TM
5-3810-305-10)
0139-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00155)