Home
Download PDF
Order CD-ROM
Order in Print
CAB INTERIOR HARNESS
HORN INSTALLATION
TM-5-3810-306-20 Container Crane 40-Ton Rough Terrain Model RTB75CC Manual
Page Navigation
226
227
228
229
230
231
232
233
234
235
236
TM 5-3810-306-20
Section VI. HORN AND ALARMS MAINTENANCE
BACKUP ALARM REPLACEMENT
TOOLS: General mechanic’s tool kit: automotive (
5180-00-177-7033
)
SUPPLIES:
Lockwashers (Item 28, Appendix C)
EQUIPMENT CONDITION:
Disconnect ground cable at shunt. (Refer to page 8-109.)
REMOVAL:
1.
REMOVE BACKUP ALARM (1).
a.
Tag and disconnect two electrical leads (5) to
backup alarm (1).
b.
Remove two nuts (4),
lockwashers
(3) and
flatwashers (2) to free backup alarm (1) from
frame studs. Discard
lockwashers
(3).
INSTALLATION:
1.
INSTALL BACKUP ALARM (1).
a.
Align backup alarm (1) holes with frame studs
and
secure
with
new
lockwashers
(3),
flatwashers (2) and nuts (4).
b.
Remove tags and connect two electrical leads
(5) to backup alarm (1).
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
3.
TEST FOR PROPER OPERATION. (REFER TO
TM 5-3810-306-10.)
END OF TASK
8-94
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business