Home
Download PDF
Order CD-ROM
Order in Print
Section VI. HORN AND ALARMS MAINTENANCE
Section VII. BATTERY MAINTENANCE
TM-5-3810-306-20 Container Crane 40-Ton Rough Terrain Model RTB75CC Manual
Page Navigation
227
228
229
230
231
232
233
234
235
236
237
TM 5-3810-306-20
HORN INSTALLATION
TOOLS: General mechanic’s tool kit: automotive (
5180-00-177-7033
)
SUPPLIES:
Lockwashers
(Item 70, Appendix C).
EQUIPMENT CONDITION:
Disconnect ground cable at shunt. (Refer to page 8-109.)
REMOVAL:
1.
REMOVE HORN (1).
a.
Tag and disconnect two electrical leads to horn
(1) terminals.
b.
Remove hex nut (2), lockwasher (3) and
flatwasher (4) securing horn (1) on turntable stud
(5). Discard lockwasher (3).
INSTALLATION:
1.
INSTALL HORN (1).
a.
Align horn (1) on turntable stud (5) and secure
with flatwasher (4), new lockwasher (3) and nut
(2).
b.
Remove tags and connect two electrical leads to
horn (1) terminals.
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
3.
CHECK FOR PROPER OPERATION. (REFER TO
TM 5-3810-306-10.)
END OF TASK
8-95
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business