TM 5-3810-306-20INSTALLATION:1.LUBRICATE SPLINES ON PROPELLER SHAFTS.(REFER TO LO 5-3810-30612.)2.INSTALL PROPELLER SHAFT(S).a. Position and align marked flanges at frontpropeller shaft and front axle yoke. Secure withfour capscrews (10) and new lockwashers (11).b. Align center bearing (7) with holes in frame andsecure center bearing (7) with two capscrews(5), washers (6), nuts (8) and jam nuts (9).c. Align marked flanges on center bearing yokeand transmission yoke with flanges on propellershaft and secure with four capscrews (1 and 4)and new lockwashers (2 and 3) on each end ofpropeller shaft.d. Torquetransmission to torque converterpropeller shaft mounting bolts to 45 ft-lbs (60Nm).e. Torque mounting bolts on transmission to axlepropeller shafts to 90-110 ft-lbs (120-147 Nm).3.CONNECT GROUND CABLE AT SHUNT. (REFERTO PAGE 8-109.)4.TEST FOR PROPER OPERATION. (REFER TOTM 5-3810-306-10.)END OF TASK10-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business