TM 5-3810-306-20
e. Remove sixteen capscrews (11), flatwashers
(12), lockwashers (13) and hex nuts (14) from
front side cover (15) and rear side cover (16).
Discard lockwashers (13).
f.
Support weight of side covers (15 and 16) and
remove ladder support (17) and ladder (18).
NOTE
Prior
to
removing
leveling
lockwashers, mark location, position
and quantity. Replace in same order,
add or relocate as required.
g. Remove three capscrews (19), lockwashers (20),
flatwashers (21) and leveling lockwashers (22)
securing front side cover (15) to frame weld nuts.
Discard lockwashers (20) and (22).
h. Remove grab handrails (23) by removing
capscrews
(24),
lockwashers
(25)
and
flatwashers (26). Discard lockwashers (25).
CAUTION
Use care when removing front side
cover to prevent damaging fuel tank
filler neck.
i.
Using a suitable lifting device remove front side
cover (15).
j.
Remove
nuts
(28),
lockwashers
(29),
flatwashers (30) and leveling lockwashers (31)
securing rear side cover (16). Discard
lockwashers (29).
k. Using a suitable lifting device, remove rear side
cover (16).
INSTALLATION:
1.
INSTALL FUEL TANK COVER AND LADDER.
a. Position rear side cover (16) and secure with
leveling lockwashers (31), flatwashers (30), new
lockwashers (29) and nuts (28).
b. Position front side cover (15) at frame weld nuts
and secure with three capscrews (19), new
lockwashers (20), flatwashers (21) and new
leveling lockwashers (22).
c. Position ladder (18) between covers. Align
ladder support (17) and secure with sixteen
capscrews
(11),
flatwashers
(12),
new
lockwashers (13) and hex nuts (14).
d. Connect tire inflator fittings (10) to ladder (18).
Secure with coupling nut (9) and install body (8).
e. Install grab handrails (23) and secure with
capscrews (24), new lockwashers (25) and
flatwashers (26).
f.
Install twenty-three machine screws (2) and
flatwashers (3). Install retaining nuts (27) where
applicable.
g. Install eighteen new lockwashers (4) and nuts
(5).
h. Install four self-tapping screws (6) to secure
plate (7).
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
END OF TASK
15-20