TM 5-3810-306-20TOOL BOX COVERTOOLS:General mechanic’s tool kit: automotive (5180-00-177-7033)Lifting device (2 ton (1812 Kg) capacity)SUPPLIES:Lockwashers (Item 15, Appendix C) (5 Required)Lockwashers (Item 2, Appendix C) (2 Required)EQUIPMENT CONDITIONS: Disconnect ground cable at shunt. (Refer to page 8-109.)REMOVAL:1.REMOVE TOOL BOX COVER (1).a. Remove four screws (5) and access cover (6)from tool box cover (1).b. Locate and remove two nuts (2), lockwashers (3)and flatwashers (4), securing tool box cover (1)to frame studs. Discard lockwashers (3).c. Locate and remove three capscrews (7),lockwashers (8) and flatwashers (9) securingcover to engine hood. Discard lockwashers (8).d. Tag and disconnect five electrical connectors totwo lights.e. Using a suitable lifting device support tool boxcover.f.Remove thirteen screws (10) and flatwashers(11). Remove tool box cover (1).g. Remove attaching hardware and lights from toolbox cover (1) if necessary.h. If door needs replacement, unscrew two self-tapping screws (12) and lockwashers (13) andslide door from hinges. Discard lockwashers(13).15-24
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business