TM5-3810-305-10
e.
f.
g.
h.
Align left edge of wrench (Figure 5-32)
with right side of lockout valve. Using a
36 mm socket and breaker bar, remove
two capscrews and four washers attaching
wrench to swing bearing and rotary mani-
fold. Remove wrench and stow in tool
box. Capscrews and washers will be
installed at a later time.
Shut engine off.
Remove remaining 16 capscrews and 32
washers from top of swing bearing. Set
them aside, for reinstallation at a later
time.
Check and clean top of swing bearing, if
necessary, where upperstructure will be
bolted down.
i. Remove all dust caps and plugs from con-
nectors on hoses and rotary manifold in
center of swing bearing (Figure 5-20).
Stow caps and plugs in tool box.
3. Attach winch extension hoses as follows:
a.
b.
Remove two coiled extension hoses (Fig-
ure 5-14) from tool box. Their ends are
connected together by quick disconnects,
and are marked with ID tags reading H-10
and H-11. Take them to right side of
carrier.
NOTE
Be sure to keep the hoses and
their quick disconnect ends clean
during this procedure.
Disconnect ends and uncoil hoses.
Figure 5-32 Rear Axle Oscillation
Figure 5-20 Location of Boom HoistCylinder Hoses
After Disconnection
5 - 2
8