• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Battery Box and Toolbox Installation.
MAIN ENGINE WIRING HARNESS MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  484    485    486    487    488  489  490    491    492    493    494  
img
. .
TM 5-3810-305-23
0077
INSTALLATION - Continued
5.
Install toolbox cover (Figure 4, Item 1) on vehicle (Figure 4, Item 9).
6.
Install four capscrews (Figure 4, Item 4), washers (Figure 4, Item 3), and new locknuts (Figure 4, Item 2) on
toolbox cover (Figure 4, Item 1).
7.
Install battery cover (Figure 4, Item 8) on vehicle.
8.
Install four capscrews (Figure 4, Item 7), washers (Figure 4, Item 6), and new locknuts (Figure 4, Item 5) on
battery cover (Figure 4, Item 8).
1
2,3
5,6
4
9
7
8
M1250105
Figure 4. Battery Box and Toolbox Cover Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install batteries (WP 0076).
2.
Place boom in resting position (TM 5-3810-305-10).
END OF TASK
END OF WORK PACKAGE
0077-4
03/15/2011Rel(1.8)root(maintwp)wpno(M00083)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.