• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Battery and Cables Assembly Installation.
Figure 2. Battery Box and Toolbox Removal.

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  481    482    483    484    485  486  487    488    489    490    491  
img
. . . . . . . .
TM 5-3810-305-23
0077
FIELD MAINTENANCE
BATTERY BOX AND TOOLBOX WITH COVERS MAINTENANCE
INITIAL SETUP:
References
Tools and Special Tools
WP 0162
Tool Kit, General Mechanic's (WP 0171, Table 1,
Item 17)
Suitable Lifting Device, 500-lb (227 kgs) Minimum
Equipment Condition
Capacity
Vehicle parked on level ground (TM
5-3810-305-10)
Boom in horizontal position and fully retracted (TM
Materials/Parts
5-3810-305-10)
Nut, Self-Locking, He M6 (WP 0172, Table 1, Item
Batteries removed (WP 0076)
138) Qty:  3
Nut, Self-Locking, He M10 (WP 0172, Table 1,
Item 132) Qty:  8
Rag, Wiping (WP 0170, Table 1, Item 52) Qty: 1
Personnel Required
(Two)
REMOVAL
1.
Remove four locknuts (Figure 1, Item 5), washers (Figure 1, Item 6), and capscrews (Figure 1, Item 7) from
battery cover (Figure 1, Item 8). Discard locknuts.
2.
Remove battery cover (Figure 1, Item 8) from vehicle.
3.
Remove four locknuts (Figure 1, Item 2), washers (Figure 1, Item 3), and capscrews (Figure 1, Item 4) from
toolbox cover (Figure 1, Item 1). Discard locknuts.
4.
Remove toolbox cover (Figure 1, Item 1) from toolbox (Figure 1, Item 9).
1
2,3
5,6
4
9
7
8
M1250105
Figure 1.
Battery Box and Toolbox Cover Removal.
0077-1
03/15/2011Rel(1.8)root(maintwp)wpno(M00083)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.