• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 14. Swing Motor Assembly.
SWING GEARBOX MAINTENANCE

Technical Manual For Crane, Wheel Mounted, Hydraulic, Light, 7 1/2 Ton Page Navigation
  1111    1112    1113    1114    1115  1116  1117    1118    1119    1120    1121  
img
. .
TM 5-3810-305-23
0160
INSTALLATION
1.
Coat motor spline with antiseize thread compound. Apply threadlock sealant to motor mounting flange.
2.
Install swing motor (Figure 15, Item 2) to case.
3.
Apply threadlock sealant to threads of two capscrews (Figure 15, Item 1) and install capscrews in swing motor
(Figure 15, Item 2).
4.
Install two new o-rings (Figure 15, Item 6) and adapters (Figure 15, Item 3) and connect hydraulic hoses
(Figure 15, Items 4 and 5) to adapters (Figure 15, Item 3).
2
3
1
4
5
6
M0460105
Figure 15.
Swing Motor Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install deck plates (TM 5-3810-305-10).
2.
Connect battery cables (WP 0076).
3.
Place boom in resting position (TM 5-3810-305-10).
4.
Check for proper operation.
END OF TASK
END OF WORK PACKAGE
0160-12
03/15/2011Rel(1.8)root(maintwp)wpno(M00179)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.