TM5-3810-305-102. Start engine. Position carrier next to upper-structure as follows:a.b.c.d.Extend outrigger beams and pads downclose to ground.Using swing lever, rotate swing bearing tounlocked position with cam roller on axlelockout valve, located at rear, bottom ofrotary manifold, centered in notch.Maneuver carrier over toward upperstruc-ture, positioning right front outrigger beamin under upperstructure (Figure 5-34).Vehicle must be level to preventpossible loss of control of upper-structure when lifting off ofground. DEATH or seriousinjury may result if upperstruc-ture gets out of controlFigure 5-34 P o s i t i o n i ngO u t r i g g eWith carrier in place, extend outriggerbeams, raising carrier off ground at allfour corners. Level carrier, using bubblelevel on right side of console.5-27
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business